1.1 Building Permit (residential and other part 9 construction)
a.) Per $1,000.00 of construction - $3.50
b.) Minimum permit fee - $50.00
c.) Construction costs to be based on insurance valuations which are revisited annually
1.) Bungalow - Per square foot - $110.00
2.) 2 - Storey dwelling - Per square foot - $195.00
3.) Car Garage - Per square foot - $30.00
d.) Basement development - $75.00
1.2 Building Permit (commercial and other part 3 construction)
a.) Per $1,000.00 of construction costs - $4.00
b.) Minimum permit fee - $75.00
c.) Construction costs to be based on tendered contract price
1.3 Moving Permit
a.) As per applicable portions of Building Permit fee schedule
2.1 Plumbing Permit
a.) Permit for new dwelling - $100.00
b.) Permit for renovation or addition - $50.00
3.1 Temporary Permit
a.) Per month up to a maximum of 6 months - $25.00
4.1 Demolition Permit
a.) For residential application - $50.00
b.) For commercial application - $100.00
5.1 Change of Occupancy Permit
a.) Residential plus applicable costs under the building permit fee's - $50.00
b.) Commercial plus applicable costs under the building permit fee's - $100.00
6.1 Occupancy Permit
a.) Pertains to C.S.A. certified mobile homes - $50.00
7.1 Sign Permit
a.) Residential - $50.00
b.) All other - $150.00
8.0 Deposits
8.1 Lot Grading Deposit (Residential)
a.) Per residence - $1,000.00
b.) Maximum for multiple units of 3 or more - $3,000.00
8.2 Lot Grading Deposit (Commercial)
a.) Per residence - $1000.00
b.) $1,000.00 per 10,000 square feet thereafter to a maximum of $5,000.00
8.3 Inspection Deposits
a.) Refundable deposit - $400.00
b.) Charge per additional inspection - $50.00
9. 0 Non-Permit Town of Altona inspection fees
a.) Per Hour - $50.00
b.) Mileage as per fee set by Council
c.) All other reasonable expenses incurred for inspection
10.0 Basic Inspections included in Permit fees
a.) Plan review
b.) Site plan inspection
c.) Footing
d.) Foundation wall
e.) 2 additional foundation inspections (garage piers and grade beam)
f.) 1 - framing inpsection
g.) 2 - vapor barrier & insulation inspections
h.) Underground plumbing
i.) Rough-in plumbing
j.) Final inspection prior to occupancy